Equipment Connections
Refer to the following figure to make the required connections.
One-Box Internal Connections

One-Box Internal Case Connections
PoE - Power for SCE-2120
BACKHAUL - Internet connection
gNB SCE-2120 Connections
WAN - Connection to Mobile Kit PoE
DBG - Used for local configuration
GPS - Used for connection to a GPS antenna
ANT1/ANT2 - Used when external antennas are desired
One-Box External Case Connections
AC Power Port at Rear of Case - Example

CAUTION: Insert the power connection with the flat side of the barrel facing up. When inserted fully, an audible “click” should be heard indicating the connector is locked in place.
CAUTION: When removing the power connection, only remove it by firmly grasping the barrel portion of the connector. This will disengage the locking mechanism allowing it to be safely removed.
Apply AC power by connecting the AC-DC power to a suitable AC outlet. The Mobile Kit Power LED, Gateway Power, and Askey gNB LED should illuminate as shown below.
Askey gNB LED status
Askey SCE-2120 LED Status
Solid Red
Initial Power On
Blue Blink (on for 3 seconds, off for 3 seconds)
Network is initializing
The small cell is acquiring an IP address.
If the LED stays at this stage for more than 5 mins.
Check the Ethernet cable is firmly connected at both ends.
Ensure the switch, router, or Internet gateway is powered on.
Green Blink (on for 1 second, off for 3 seconds)
GPS sync in progress
The small cell is syncing and acquiring a GPS signal.
If the LED stays at this stage for more than 10 mins, the small cell has failed to acquire the minimally required GPS signal. Move your GPS antenna closer to a location with better signal access. NOTE: First GPS sync lock may take up to 45 minutes.
If a GPS signal is not available, switch timing to Free-Running mode.
Fast Green Blink
Static IP in being set
Blue Blink (on for 1 second, off for 3 seconds)
OAM configuring
The network management server is provisioning the small cell.
If the LED stays at this stage for more than 10 minutes, the small cell has not received all required or correct provisioning parameters from HeMS.
Reboot your device again.
If the issue persists, contact GXC Technical Support.
Blue Blink (on for 1 second, off for 1 second)
5G service is initializing
The small cell is syncing with the 5G network.
If the LED stays at this stage for more than 10 minutes, the small cell is still trying to connect to HeNB Gateway. Check the LAN/firewall setting or contact your network administrator.
If the issue persists, contact GXC Technical Support.
Solid Blue
5G service ready
5G service is ready on the small cell.
Fast Blue Blink
Software upgrade in progress
Upgrade in progress. The unit will reboot when complete.
Red Blink (on for 3 seconds, off for 3 seconds)
Unit is overheating
The small cell is overheating. Place this device in a cool area where the ambient temperature is between 23~122°F.
Red Blink (on for 1 second, off for 1 second)
GPS signal not available
The small cell has tried to acquire GPS signal for 10 minutes, but failed to acquire minimally required GPS signal.
Move your GPS antenna closer to an area where a GPS signal can be acquired.
If the issue persists, place the unit in Free-Running mode.
Last updated
Was this helpful?
