Applying Power
The following sections detail the installation of the field replaceable power supply units (PSU) and the connection to the AC Line to power the Onyx FHM.
WARNING: The AC Line of the Onyx FHM can present dangerous voltage. Contact with the line voltage can result in pain or injury.
1. Verify that the chassis ground of the Onyx FHM is connected to an earth ground before connecting AC Power Cable to the Onyx FHM unit.
2. Verify that the AC Line has a quality signal ground integrated with a circuit breaker prior to applying AC Line Power to the Onyx FHM.
3. Ensure that line voltage is not present when plugging the AC Power Cable to the PSUs of the unit. Only plug units into AC Line voltage after they are connected to the Onyx FHM.
The PSUs are pre-installed in the Onyx FHM. The PSU is a hot swappable field replaceable unit (FRU) and can be replaced while the equipment is operating if the remaining (second) PSU is installed and in operation.
The following instructions detail how to install a new PSU field FRU in the Onyx FHM.
PSU Replacement
WARNING: Shock hazard! For safety, disconnect power input cable from the power supply unit before servicing the equipment.
PSU FRU Removal
Locate the release tab on the PSU FRU and press and hold the blue release tab to the right to unlock the PSU from the power bay.
While holding down the release tab, grip the PSU's handle and firmly pull it out of the power bay.
PSU FRU Removal

PSU FRU Installation
Align the new PSU with the empty power bay, ensuring the PSU’s power connector is in the correct orientation (see Figure 24).
Carefully slide the new PSU into the power bay and gently push until the front surface of the PSU is flush with the front surface of the case.
An audible click will be heard when the PSU is installed correctly. The PSU will not go in all the way if it is inserted in the wrong orientation.
CAUTION: If the insertion of the PSU results in either significant resistance or a hard stop, remove the PSU and inspect it for correct orientation and/or damage. If damage is found or insertion issues persist, contact your supplier for replacement of the PSU. Do not attempt to repair a damaged PSU.
PSU FRU Installation

Connection of AC Power
Ensure there is enough power available on the selected electrical circuit to supply the Onyx FHM. The maximum system power consumption is 188.22 watts with an input voltage of 100-240V AC. It is recommended to ensure that enough power is available from the power distribution system prior to installation.
The Onyx-FRU is designed to support 1 + 1 power redundancy. Ensure that both PSU FRUs have been properly installed before powering up the equipment.
Insert the AC PSU Cable Receptacle of 1 pc. of the included power cords into the AC PSU ensuring that it is fully inserted.
Insert the standard AC Plug into the desired AC outlet. If necessary, switch on power strip that PSU(s) are plugged into.
Verify that the power supply is operating. The LED on the PSU will illuminate Green designating normal operation.
Installing the AC Power Cord into the PSU FRU

Verifying System Operation
Front Panel LED
Verify successful boot up of Onyx FHM by checking the system LED Tree located on the front panel. When operating normally, the PWR, FAN, and SYS LEDs should all display green.
Onyx FHM Front Panel LED Tree — GNSS

Onyx FHM Front Panel LED — GNSS
Off
GNSS is not configured. NOTE: Need NOS to activate this feature.
Solid Green
GNSS is in normal state. Self-survey is complete. NOTE: Need NOS to activate this feature.
Blinking Green
GNSS is in learning state. Self-survey is not completed. NOTE: Need NOS to activate this feature.
Solid Yellow
Power up. GNSS is not tracking any satellite. NOTE: Need NOS to activate this feature.
Blinking Yellow
GNSS Antenna is shorted to ground. NOTE: Need NOS to activate this feature.
Onyx FHM Front Panel LED — SYNC
Off
System timing synchronization is disabled, or unit is in free-run mode. NOTE: need NOS to activate this feature.
Solid Green
System timing core (1588 and SyncE) is synchronized to external timing source (ex: GNSS, 1PPS, PTP, BITS, etc.) NOTE: need NOS to activate this feature
Blinking Green
System is synchronized in SyncE mode.
NOTE: need NOS to activate this feature.
Solid Yellow
System timing core is in acquiring state or holdover mode.
Blinking Yellow
System timing synchronization failed.
NOTE: need NOS to activate this feature.
Onyx FHM Front Panel LED — SYS
Off
Reserved
Solid Green
System boot complete
Blinking Green
Reserved
Solid Yellow
Reserved
Blinking Yellow
System boot not complete
Onyx FHM Front Panel LED — FAN
Off
Reserved
Solid Green
All FAN Modules Operating Normally
Blinking Green
Reserved
Solid Yellow
Reserved
Blinking Yellow
One or more FAN module(s) have failed or no FAN module present
Onyx FHM Front Panel LED — PWR
Off
No power or in shutdown mode.
Solid Green
System power good & BMC is present & BMC power good
Solid Yellow
System power good & BMC is absent
Onyx FHM Front Panel LED — ID
Off
No Power
Blinking Blue
Beacon feature is enabled
Onyx FHM Front Panel LED — PSU FRU LED
Off
No AC power input to this PSU.
Flashing Red
No DC power output from this PSU.
Flashing Green
DC present, only standby output on. Poor contact.
Green
PSU DC output ON and OK.
Red
PSU failure.
Alternating Flashing Green and Red
Warning. Working conditions are not satisfied. Please check the voltage, electric current, and temperature.
Onyx FHM Management Port LED — Left LED
Off
1G no link
Solid Green
1G link-up
Blinking Green
1G TX/RX activity
Onyx FHM Management Port LED — Right LED
Off
No activity
Solid Amber
10M/100M link-up
Blinking Amber
10M/100M TX/RX activity
Post Installation Steps
After installing the FHM, connect the RUs to it, starting with port 0.
Ensure all RUs are of the same model.

Onboard the FHM.
Refer to 5G Onyx Portal Operations Guide > Add FHM.
Last updated
Was this helpful?
